ZHAO SUIKANG | 赵穗康 |
America's Cup Harbor Parking Facility Working in Progress
Case Study |
<Portfolio |
|
Case Study:
The artwork will have five sails that replace pre-designed four sails.
Material: perforated steel with color variation of yellow-green
The Point:
Artwork enhanced the dynamic movement of the architect